We manage the project so that you can manage the completed facility
We manage the project so that you can manage the completed facility
High-quality design minimizes risks in construction, and the design phase lays the foundation for successful implementation. Our architectural firm, Spectra, develops a strategy to effectively plan tasks and budgets and deliver projects on time.
01
About us
Let's become a project manager in project management.
blok-2 blok-3 4 blok-5
01
About us
blok-2
Let's become a project manager in project management.

As a professional architectural bureau, we take on the coordination of all processes and services. Our tasks:

  • to understand your vision,
  • to suggest how to implement it in the best way,
  • to consider bottlenecks,
  • to modify unrealistic plans,
  • to outline risks and their solutions,
  • to ensure effective communication between all participants.
01
About us
blok-3
We reduce construction time thanks to BIM technologies.

We integrate architecture, engineering systems, and interior solutions into a single digital model. This allows us to verify the functionality of spaces, optimize layouts, and avoid technical conflicts even before construction begins.

01
About us
4
We handle the red tape involved in expert reviews and permits.

We prepare a complete package of materials, organize the coordination process with all relevant services, and support the project in its dealings with the responsible authorities.
This enables projects to consistently pass expert review and move into implementation without delays.

01
About us
blok-5
We are responsible for meeting deadlines.

A separate team works on each project: a chief engineer and designers specializing in specific sections.
We have organized our work so that the teams are not overloaded with projects, can deeply immerse themselves in your task, and complete the work on time.

02
We are the ones people turn to when they need:
blok-6 blok8-bolnytsa-1 blok-7-2 blok-7-3
02
blok-6
We are the ones people turn to when they need:
  • to build a people-friendly school
  • a hospital or a kindergarten
  • to implement complex social projects.

For example — reconstruction and construction of a new building of the regional children’s hospital in Mykolaiv

02
blok8-bolnytsa-1
We are the ones people turn to when they need:

One such project is the reconstruction and construction of a new building for the regional children’s hospital in the city of Mykolaiv.

02
blok-7-2
We are the ones people turn to when they need:

Implement complex engineering networks.
We have designed complex trunk networks for water and gas

02
blok-7-3
We are the ones people turn to when they need:

Designing the recovery of Ukraine. Because recovery means convenient social infrastructure and resilience under any circumstances.

We have designed bomb shelters for more than 10,000 people. We have designed a neighborhood in Pervomaisk, where 12,000 people will live.

We're here for those who want to take action.
We do what works.
We're here for those who want to take action.
We do what works.
We're here for those who want to take action.
We do what works.
We're here for those who want to take action.
We do what works.
We're here for those who want to take action.
We do what works.
We're here for those who want to take action.
We do what works.
We're here for those who want to take action.
We do what works.
We're here for those who want to take action.
We do what works.
04
We're ready for commissioning
blok9

We manage projects from concept to
completed building

04
We're ready for commissioning
We’ll make sure your construction project runs smoothly without any downtime

For us, a project does not end with the drawings.
It is completed only when the building is put into operation and begins its own life.
A modern design company Spectra takes responsibility for every decision made.
That’s why our specialists are present during construction and assist contractors on the construction site.

Our task is to ensure that the planned projects are built on time and within budget:

  • we find solutions in difficult situations when the project needs to be changed. For example, if during reconstruction a wall is demolished and something different is found than what was indicated in the documents. Our job is to make sure this does not affect the timeline or the implementation budget;
  • we ensure that the construction matches the project and successfully passes all necessary inspections on time;
  • we answer builders’ questions and promptly provide the necessary clarifications.